  • 1994 - COMPLETE OIL TANK FARM FOR VOPAK FORMERLY WILMINGTON LIQUID BULK
  • 1994/95 - 62500KVA - 13800V-4800V AND 37500 KVA - 13800V-480V SUBSTATIONS AT R.R. DONNELLEY.
  • 1994/95 - NEW PRINTING PRESS AT R.R. DONNELLEY AND G.T.E.
  • 1995 - 2.6 MEG WATT GO GENERATION PLANT AT R.R. DONNELLEY
  • 1995/96 - NEW 16KV SUB STATION, CASTING FURNACES, TRANSFORMERS, CONVEYERS AND SILO SYSTEMS AT GREGG IND.
  • 1996 - INSTALLATION OF MACHINERY AT ROCKWELL AND NORTHROP AEROSPACE COMPANIES FOR COAST MACHINERY.
  • 1997 - BUILD NEW OFFICE BUILDING FOR UNIVERSAL ALLOY
  • 1997 - NEW 4000 AMP SERVICE SUB STATION FOR UNIVERSAL ALLOY, INCLUDING PRIMARY METERING WITHIN PLANT
  • 1998 - REPLACE 12KV TO 500 VOLT TRANSFORMER ON HOT MILL AT COMMONWEALTH ALUM, INCLUDING FEEDERS TO 1200HP MOTOR
  • 1999 - INSTALL THEATER AND SHOW ROOM FOR PRESENTATIONS AT BOEING FOR GONZALES CONSTRUCTION
  • 1999 - INSTALL ELECTRICAL WIRING FOR ORANGE CO. FEDERAL CREDIT UNION IN STATER BROS MARKETS FOR WILSON CONSTRUCTION
  • 1999 - REPLACE EXISTING RELAY LOGIC CONTROL WITH NINE ALLEN BRADLEY PLC’S FOR UNIFIED WESTERN GROCERS
  • 1999 - INSTALL LARGE GRANCO CLARK AUTOMATED EXTRUSION LINE AND CUT OFF CONTROL SYSTEM FOR MAMMOET WESTERN AT INTERNATIONAL EXTRUSION
  • 1999-2000 INSTALLED NEW AUTOMATED ALUMINUM EXTRUSION PRESS FOR FRONTIER ALUMINUM
  • 2000 - INSTALLATION OF 1200 TON HORIZONTAL LOWEY PRESS FOR MAMMOET WESTERN, FROM NEW YORK TO TEXAS
  • 2000 - INSTALLATION ON TREATER LINE FOR FRIZE AT CYTEC
  • 2000 - COMPLETE LIGHTING RETROFIT, AT DENSO CORP. LONG BEACH
  • 2001 - INSTALLED NEW 2500KVA SUBSTATION AND NEW 3000 AMP PRESS FEEDER. RELOCATE BINDERY INSERTER EQUIPMENT AND FULL SIZE BINDERY LINE AND NEW LIGHTING FOR RR DONNELLEY & SONS
  • 2001 - INSTALLED TREATER LINE, AUTOMATIC LAY UP AND LAMINATION EQUIPMENT, INCLUDING FEEDERS FOR NELCO PROD.
  • 2002 - BOEING ROCKDYNE CANOGA PARK RAISED FLOOR COMPUTER ROOM.
  • 2002 - 12KV SWITCH, SUB-STATION AND FEEDER TO NEW PRESS RR DONNELLEY TORRANCE CALIFORNIA.
  • 2002 - INSTALL NEW SERVICE, RE-LOCATE COMPLETE COMPOSITE MANUFACTURING PLANT, STRUCTURAL COMPOSITE INDUSTRIES, POMONA.
  • 2002 - THERMAL AFTERBURNER INSTALLATION AT RR DONNELLEY, TORRANCE, CA.
  • 2003 - BUILD CONTROL PANELS AND INSTALL MOTOR AND CONTROL WIRING ON GLASS BOTTLING LINE AT ST. GOBAIN, EL-MONTE, SUB CONTRACTOR TO CAN LINES.
  • 2003 - PEBBLE MILL ELECTRICAL UP-GRADE AT SPECIALTY MINERALS, LUCERNE VALLEY, CA.
  • 2003 - DISCONNECT PRESSES MOVING FROM TEXAS AND RECONNECT IN MEXICO.
  • 2003 - INSTALL CAT-5 CABLING AT THE WELLS FARGO TOWERS, LOS ANGELES.
  • 2004 - INSTALL NEW 3000 AMP UNDERGROUND SERVICE AND RETROFIT 6" TUBE-MILL DRIVES WITH NEW ROCKWELL DRIVES, CUT OFF CONTROL. WIRE BUILDING EXPANSION, NEW HANDLING AND STRAPPING SYSTEM.
  • 2004 - INSTALL 5 NEW BUSS DUCTS WITH DISTRIBUTION FOR EQUIPMENT BEING RELOCATED AT TABC, LONG BEACH, CA.
  • 2004 - INSTALL NEW 2000 AMP 480/277 VOLT SERVICE AT TRI-MODAL TRANSPORTATION IN CARSON, CA.
  • 2004 - DISCONNECT ALUMINUM COIL COATING PAINT LINE IN TORRANCE, UP-GRADE DRIVES AND CONTROLS AND RE-INSTALL IN CARSON, CA.
  • 2005 - PERFORM RELOCATION OF PROCESS EQUIPMENT AT TABC, LONG BEACH, CA.
  • 2005 - RELOCATE AVERY DENNISON PLANT WITHIN CITY OF RANCHO CUCAMONGA, CA.
  • 2005 - RUN FIBER OPTIC CABLE AND TERMINATE AT SAINT GOBAIN, EL MONTE, CA. RUN CAT5 CABLING TO HUB LOCATION WITHIN PLANT.
  • 2005 - INSTALL 12KV LOAD BREAKER INTERRUPTER SWITCH AT PACIFIC ALLOY CASTING, SOUTH GATE, CA. PULL NEW HIGH VOLTAGE CABLE AND RELOCATE TRANSFORMER .
  • 2005 - REMOVE 2.6 MEGA WATT CO-GENERATION PLANT AND INSTALL ONE 400 TON AS WELL AS ONE 500 TON CHILLER IN CO-GEN BUILDING RRD TORRANCE CA.
  • 2005 - RE-LOCATE WHEEL ASSEMBLY EQUIPMENT FROM GARDENA TO AMERICAN RACING RANCHO DOMINGUEZ CA.
  • 2005/06 - MILL UPGRADE, BUILDING EXPANSION, MARUICHI SANTA FE SPRINGS CA.
  • 2006 - 3000AMP PANEL INSTALLATION AND MACHINE CONNECTIONS, PCA GARDEN GROVE CA.
  • 2006 - EQUIPMENT RELOCATION FROM LONG BEACH TO IRVINE, COAST MACHINERY MOVERS, EL MONTE CA.
  • 2006 - MILL UPGRADE AND MACHINE MOVE, SPECIALTY MINERAL LUCERN VALLEY CA.
  • 2006 - PLANT RELOCATION, ALCO METAL SANTA ANA CA.
  • 2007 - RELOCATE RUBBER PLANT SANTA ANA TO CITY OF INDUSTRY
  • 2007 - INSTALL GANTRY MILL, CONTROL BREA
  • 2007 - INSTALL NEW FURNACE 5KV LA CASTING DOWNEY
  • 2008 - INSTALL NEW 3000AMP SERVICE, QUAL PRO, TORRANCE
  • 2008 - RELOCATE THE ENTIRE PLANT OF INVENSYS FROM COMPTON TO MEXICO
  • 2008 - EXTEND BUILDING#1 100 ADDITIONAL FEED INCLUDES LIGHING AND MACHINES, MARUICHI INC.